Damage Prevention Program - ISNetworld RAVS Section - US
$ 34.95
Damage Prevention Program - ISNetworld RAVS Section - US
This Damage Prevention Program (ISNetworld® RAVS®* Section), in addition to being a complete and functioning written safety program (chapter), it also contains all the required text elements that are sought by the ISNetworld RAVS® (Review And Verification Service) reviewer. This plan has been previously submitted and has achieved a 100% approval rating for our clients.
- All programs are guaranteed now and in the future to achieve 100% approval.
- There are NO maintenance or subscription fees.
- Simply notify us if any program falls out of compliance and we will correct it at NO CHARGE.
You are downloading a MicroSoft® Word document file to your computer that is completely editable:
- Damage Prevention Program:
- Approximate Word Count: 3,850
- Approximate Number of Pages: 13
- Page Reference Answers to RAVS Reviewer’s Questions: 8
You will also receive instructions for a simple two-step process to place your company name and safety person's name throughout this word document to conform it to your company. Please review, and feel free to alter or add to it as you wish with any specific company information or safety policies that you may already have.
The first two pages of the document are guidelines for conforming this safety manual section, an index for completing the RAVS® questionnaire (with all page references), and uploading the section.
If you experience any difficulty filling out the questionnaire, or have any questions in general about these documents, call 314-570-0072, or e-mail me at vsunshine1@gmail.com.
An excerpt from ISNetworld® RAVS®* Safety plan Damage Prevention Program
White Lining
When the excavation site cannot be clearly and adequately identified on the locate ticket, the excavator designates the route and/or area to be excavated using white premarking, either onsite or electronically (when available through the one call center), prior to or during the request for the locate ticket.
One Call Facility Locate Request
The excavator requests the location of underground facilities at each site by notifying the facility owner/operator through the one call center. Unless otherwise specified in state/provincial law, the excavator calls the one call center at least two working days and no more than ten working days prior to beginning excavation.
Separate Locate Requests
Every excavator on the job has a separate one call reference number before excavating. This includes first tier subcontractors, and lower tier subcontractors performing excavation activities on a project. All are required to call and request their own locate.
Locate Reference Number
The excavator receives and maintains a reference number from the one call center that verifies that the locate was requested.
One Call Reference at Site
Except in case of an emergency, the excavator at each job site has available a complete description of the dig site, a list of the facility owner members impacted at that dig site as identified by the one call center, and the one call center ticket number.